First stage · continuous distillation

From fermented mash to crude spirit

Heads separation before rectification

The continuous mash column works with an epuration column. After mash distillation, the heads fraction is separated. Crude spirit with the heads removed then passes to the second stage.

Fermented mashMash distillation and heads removalCrude spirit

A new operator can learn how to adjust and service each stage in turn, without having to balance the entire process as a continuous system.

Second stage · batch rectification

More time for ethanol collection

Continuous mash distillation with heads removal, followed by batch rectification of crude spirit. The rectification vessel has a total volume of 900 L. Its working charge is 850 L of crude spirit, loaded once per day.

900 LTotal vessel volume
1 charge per dayCrude spirit charging

The heads fraction has already been separated in the first stage. Less rectification time is therefore spent on heads removal, leaving more time to collect the required ethanol fraction.

Automation and support

Keep the process under control

Settings at the control panel. Operating data and history in the cloud

The operator enters the starting values and monitors the plant. The system runs the configured cycle and reports deviations. Our technical team helps with commissioning, settings and data analysis.

PlantParameters and eventsCloud operating data
More about automation and operator tasksSpecifications, layout and equipment

Process flow

Mash
Continuous mash distillation column + heads removal
Crude spirit
Rectification
Ethanol

Continuous mash distillation and batch rectification take place in separate modules.

Heads separation before rectification

Each unit has a distinct role: the mash column separates alcohol from the fermented mash, a separate column removes the heads fraction, and the rectification module brings the spirit to the required specification.

Mash
Continuous mash distillation column
↘ Heads-fraction removal
Crude spirit
Rectification

Design

Continuous mash distillation with heads removal, followed by batch rectification of crude spirit. 900 L total vessel volume / 850 L working charge.

Nominal output is 500 L/day. Actual output may vary slightly with the feedstock and operating conditions.

Automation and operator tasks

Mash distillation and rectification operate as two independent modules.

Operator

Prepare the batch and enter the starting values

Before start-up, the operator checks that the equipment is ready, enters the crude spirit volume and its measured alcohol strength, and selects the agreed settings. Mash preparation and equipment checks are carried out on site.

Automation

The system calculates and controls the cycle

The control system uses the starting values and settings to calculate fraction take-off and the expected cycle duration. It regulates heating and take-off rate while the operator monitors rectification and responds to system messages.

Fractions collected in designated vessels

The system switches operating modes to collect the specified fractions in sequence. The operator prepares and connects the required vessels in advance according to the equipment layout.

The operator has fewer manual changeovers during the multi-hour cycle, a clear sequence to follow and a record of the process. Product quality also depends on the feedstock, preparation and operating conditions.

Control interface: RU / EN / DE / FR / AR. Available languages and interface version are confirmed for the selected configuration.

SPZ-500 automation

Two independent screens: mash distillation and rectification

Cloud-based operating data

All four models provide remote control, operating statistics, a mobile application and cloud access. Maintenance of the cloud service is billed separately.

Equipment
Parameters and events
Cloud operating data
Analysis and support

We define the available operating data, access rights and network connection when selecting the control system. Monitoring parameters does not replace the on-site operator.

Protection at three levels

Mechanical components, electrical protection and control algorithms work together. The specific devices and responses to deviations are defined by the project and described in the documentation.

Mechanical protection

Pressure and temperature monitoring, safety valves specified for the plant, and connection checks help operators monitor the condition of the equipment.

Electrical protection

Earthing, protective devices and selected electrical components form part of the connection scheme. Site power supply and protection requirements are provided with the documentation.

Protective algorithms

The system logs the faults it is configured to detect, alerts the operator and carries out the programmed response, such as limiting operation or stopping the affected units. The available responses depend on the sensors and control logic fitted to the plant.

Select a protection scenario

Deviation
Message and log
Response under the operating procedure

Temperature or cooling deviation

If monitored parameters deviate, the operator receives a system message. The cause is checked using readings, the event log and operating procedures; the equipment response follows the specified protective scenario.

Automation helps detect and respond to the specified deviations. Correct connections, maintenance and the actions of a trained operator remain essential operating requirements.

Site layout

Layout for your site

We plan module positions, utility connections and working aisles around your premises. The layout covers both the main plant and the auxiliary production areas.

Example layout for grain feedstock
Minimum hall height≥ 4 m

Utility connections for your configuration

The 500 L/day unit has standard electric heating and can be converted to external steam. The 1000, 1500 and 3000 L/day units use external steam. Where the site can supply steam of the required quality and flow, no boiler purchase is needed.

Access for operation and maintenance

We plan aisles and access to control panels, pumps and connections so the operator can monitor the plant and service its components comfortably.

Space for auxiliary areas

For the 500 L/day model, the fermentation tank size for site planning is 5,000 L. Fermentation tanks are outside the base unit. The fermentation room needs at least 3 m of clear height, typically 3–3.2 m. The distillation and rectification hall needs at least 4 m. A 5,000 L fermentation tank on its stand is approximately 2.5 m high. Entire site area: 100–120 m² for sugar feedstock; ≈200 m² for grain.

Indicative area for the entire 500 L/day site

Grain feedstock

≈ 200 m²

Entire site area: 100–120 m² for sugar feedstock; ≈200 m² for grain.

Sugar

100–120 m²

For sugar feedstock, allow 100–120 m² for the whole 500 L/day site. The grain cooking and grain-stillage processing areas are not required.

We determine the exact area for the premises and selected configuration

Plan the layout around your premises

Send us a floor plan or the room dimensions, ceiling height and utility locations. We will use these to plan the modules, auxiliary areas and service access.

Discuss the layout

Example layout for grain feedstock

Enlarged sketch of a layout for production from grain feedstockDistillation and rectificationFermentationFeedstock cooking and preparationStillage processingStorage of finished products and by-product fractionsShowerToiletChanging roomEntrance areaGrain storage and milling

Utilities and heat supply

The 500 L/day unit is supplied with electric heating (approximately 70 kW). The same unit can be converted to external steam to the manufacturer’s technical specification. Use suitable steam already available on site or a separately selected boiler. An external boiler is selected separately to the manufacturer’s technical specification. Suitable boiler fuels include natural gas, diesel, coal, pellets and waste oil; LPG is also an option with a compatible boiler.

Standard electric heating

≈ 70 kWPreliminary estimate

The 500 L/day unit is supplied with electric heating (approximately 70 kW). The same unit can be converted to external steam to the manufacturer’s technical specification. Use suitable steam already available on site or a separately selected boiler.

Estimated external boiler fuel demand

Natural gas5–7m³/h
LPG (propane–butane)11–14L/h

Standard electric heating is approximately 70 kW. For an external boiler only, the planning figures are 5–7 m³/h of natural gas or 11–14 L/h of LPG. Actual fuel use depends on operating conditions. Electrical power is measured in kW; energy consumption over time is measured in kWh.

Electricity
Standard electric heater
Ethanol production

We compare energy use per litre and opportunities to recover useful heat, taking account of the plant’s operating mode and utilisation at your site.

Self-contained cooling and heat recovery

Ethanol production
↻
Workshop heating + preheating mash water

Lower costs for water, wastewater disposal and additional heating

The cooling package is agreed separately. We account for its electricity consumption and the site's actual demand for heat.

Condensate return with external steam

With indirect external steam heating, steam transfers heat through a heat exchanger. The project specifies how condensate is returned to the site steam system.

External steam source
Heat exchanger
Condensate
Return to site steam system

Returning warm condensate reduces the need to treat and reheat replacement water. We calculate the benefit for the proposed heat supply and operating conditions.

The steam-and-condensate circuit and the cooling circuit serve different purposes. Indirect heating, condensate return and water requirements depend on the selected configuration.

Quality and support

GOST Lux and Alpha ethanol grades from a compact plant

All four models target the same quality of finished spirit. Both batch and continuous rectification can meet that target when the feedstock, process conditions and quality control are appropriate. Producing the selected grade requires suitable feedstock, proper mash preparation and adherence to production conditions. Lux uses grain feedstock; Alpha uses wheat, rye or a mixture of both.

Suitable feedstock
Properly prepared mash
Process conditions
Product specifications

Feedstock and process selection for your ethanol application

Starchy feedstock preparation → saccharification → fermentation
Ethanol

For each feedstock, the process instructions set out preparation, the production cycle and the target ethanol specification, together with the expected yield.

We select the process for food-grade or industrial ethanol applications. Lux and Alpha grades require suitable grain feedstock and compliance with process requirements.

GOST “Lux”

GOST “Alpha”

Wheat, rye or a mixture of both

Grades under GOST 5962-2013 can be obtained with suitable feedstock and compliance with the full set of process requirements.

Equipment checks before shipment

We assemble the plant and connect the controls at our site. In your presence, we check the controls, sensors and pumps, inspect assembly quality and verify the scope of supply. We then explain how to assemble, start and maintain the equipment.

With the buyer present

Plant assembly

Assembled plant with the control system connected

Component checks

Controls · sensors · pumps

Practical guidance

Assembly · start-up · maintenance

Packing and shipment

Dismantling with the buyer present

See the assembled plant

You can inspect the complete assembled structure and the quality of its components and assembly. Together, we check that the equipment matches the agreed scope of supply.

Checking controls, sensors and pumps

We check the controls, sensors and pumps in the buyer’s presence. We show the main components and connections and explain their functions.

Assembly, start-up and maintenance guidance

We explain the dismantling and assembly sequence, start-up procedures and routine maintenance. You can see the connections and components the operator will work with.

Dismantling, packing and shipment

We dismantle the plant for transport in your presence, then pack and dispatch it. We show you how the sections fit together when the plant is reassembled at your site.

The customer sees the assembled equipment and its preparation for transport, and receives practical guidance on assembly, start-up and maintenance.

What we agree before manufacture

Supply and support

What the complete distillation unit includes

Included in the base unit

The unit processes prepared fermented mash into rectified ethyl alcohol. The base supply includes its process modules, pumps, internal hoses and connections, and the controls for the unit itself.

Outside the base supply

Fermentation takes place outside the base distillation unit. For the 500 L/day model, plan the fermentation section for a tank capacity of 5,000 L. Fermentation tanks are not included in the base supply.

Site preparation and external connections

The customer prepares the premises to the manufacturer’s technical specification. External utility lines up to the unit’s connection points, together with their materials and costs, are the customer’s responsibility.

Mash feed and product discharge

The operator connects the fermented mash feed. Once commissioning is complete and the specified operating conditions have been established, the unit delivers rectified spirit to the customer’s receiving vessel.

Equipment and scope of supply
Dimensions and layout
Utility connections and consumption
Documentation and training programme
Commissioning, support and a possible visit

Operating documentation

Documentation for assembly, connection, operation and maintenance of the selected model.

Process instructions

Mash preparation and processing conditions for the selected feedstock, tailored to food-grade or industrial ethanol production.

Production line training

Training in mash preparation, operator tasks and production line operation under the agreed programme. We help prepare for remotely guided commissioning.

Remote consultations

Help with commissioning, operation, settings and diagnostics. We review operating parameters and history, including cloud-based operating data.

Commissioning and support with the manufacturer's team

Commissioning is normally carried out on site with remote guidance from our team, followed by support under the agreed programme. The customer organises the site work and provides qualified personnel and an operator.

Remotely supported commissioning and operation

We provide operating documents and process instructions, train staff and help with settings and troubleshooting. Where available, cloud-based operating data help us investigate issues together with your team.

A specialist visit when needed

If a task requires a specialist on site and the team is available to travel, a visit can be arranged separately. The scope of work, fee and timing are agreed separately.

Your next step

Get a proposal for your production

Select a model and leave an email address and phone number. If available, add your installation site, feedstock, heat source and desired daily output so that we can prepare a project quotation.

Equipment / layout / utility requirements / price / production costs / support

Message us

Contact and support: Russian and English

Request a quote for an ethanol plant

Enter your email address and phone number. Both fields are required.

Project details (optional)

Cloudflare Turnstile checks this form for automated submissions. Privacy

What to know before choosing a plant

What is included in the supply, and what is handled on site?+

The quotation and specification set out the equipment, documents and support included in the supply. The customer arranges installation and site preparation. Commissioning is normally supported remotely. A site visit can be arranged separately, subject to need, team availability and an agreed fee and schedule.

Can the plant operate without a continuous cooling water supply?+

Yes, with a separately agreed self-contained cooling package. A continuous supply and discharge of cooling water are not required; useful heat reuse depends on the system design and site conditions.

How do natural gas and LPG differ?+

An external boiler is selected separately to the manufacturer’s technical specification. Suitable boiler fuels include natural gas, diesel, coal, pellets and waste oil; LPG is also an option with a compatible boiler.

Can a specialist visit the site?+